THE JAMES BAY 


The dams will also require 12 
spillways, 6 control structures, 
and 218 dikes. The dikes forming 
the reservoir areas will have a 
combined length of about 128 
kilometres — double the length of 
dikes built for the huge Churchill 


The history of the generation and transmission of hydroelectric power 
is a relatively short one, dating in Canada only from the last half of the 
Nineteenth Centry. 

In the hundred years that have passed, this source of energy has 
undergone a tremendous development. In fact, whereas in 1900 total 
installed hydro capacity in Canada was a mere 133,000 kilowatts , today 
it is over 200 times as large, a fabulous expansion considering the fact 


that population in the same period has increased only fourfold. 


One of the greatest hurdles that 
stood in the way of widespread 
use of electricity was the problem 
of transmitting power from the 
often remote and inconvenient 
power sites to urban areas. This 
was partially solved in the first 
decade of this century by the use 
of high-tension transmission lines 
permitting electric power to flow 
over fairly long distances. How- 
ever, the vast hydroelectric po- 
tential of Northern Canada, 
especially in Quebec, Labrador, 
Manitoba, and British Columbia, 
lay beyond the reach of high-ten- 
sion transmission lines. This was 
left undeveloped until the 1960’s 
when a_ technological break- 
through, the development. of 
extra-high voltage (EHV) trans- 
mission, dramatically extended 
the distance over which electric 
power could be transmitted econ- 
onically. This breakthrough, there- 
fore, made available the power of 
the James Bay complex. 

This development will cover an 
immense area of 356 square kilo- 
metres, more than one-fifth of 
Quebec. Within the area, which 
lies some 430 kilometres north of 
Montreal, there are five large 
rivers, the Nottaway, Broadback, 
Rupert, Eastmain, andLa Grande, 
and more than 100,000 lakes. 

The hydroelectric development 
of the area has been divided into 
two regions and two phases; the 
first phase will be the construc- 
tion of the La Grande complex in 
the northern part of the region, 
while the second phase will be 
centred in the south, harnessing 
the Rupert, Broadback and Not- 
taway Rivers, as well as the upper 
reaches of the Eastmain. 

This focal point of the develop- 
ment sector represented a super- 
ior choice for two main reasons: 


50 


Large additional quantities of wa- 
ter, could be easily diverted into 
the La Grande River basin from 
the Caniapiscau, Great Whale 
and Opinaca Rivers, increasing 
the average annual flow of the La 
Grande by 80%, and the topo- 
graphy was such that a great deal 
of power could be produced with 
only a few generating stations. 
Power available from La Grande 
complex is expected to exceed 8 
milion kilowatts, or in terms of 
annual energy, 58 billion kilowatt 
hours. 

Four main dams and power- 
houses will be built along the La 
Grande River on four sites desig- 
nated LG-1, LG-2, LG-3 and LG-4. 
The powerhouses will be distrib- 
uted along the river for a distance 
of 480 kilometres from the coast, 
using the entire vertical drop avail- 
able between the highest eleva- 
tion of 363 metres and sea level. 


Falls development. 

The LG-1 site will be situated 
36.8 kilometres up river from Fort 
George. The powerhouse will be 
located in the river channel and 
will have eight 115,000 kilowatt 
units. 

Atthe LG-2 site, 116 kilometres 
from Fort George, there will be 
sixteen 275,000 kilowatt units 
using avertical drop of .42 metres 
and with an installed capacity of 
4,400,000 kilowatts. 

The power installation at LG-3, 
located on an island 236 kilo- 
metres from the river 
metres from the river’s mouth, will 
have a capacity of 1,500,000 kilo- 
watts, and its five 300,000 kilo- 
watt units will utilize a vertical 
drop of 79.5 meters. 

Finally, LG-4 will be built 460 
kilometres from Fort George, and, 
similar to LG-2, this powerhouse 
will be located underground. Four 
375,000 kilowatt units, utilizing a 


TEN YEARS Teer. 


Va 
reat 


a 
ies 
Pa 
EI 
Ee 
ae 
en 
ae 


Pee! 
a7 
At 
4 
ad 


aa 
ada 
el 
an 


| | | oO eee 

eeu ie | | a 
ca 
Peaks ros 
Cas 
pe" 
cia |e 


pS 


Go | S| 


1967 1968 1969 


1979 1971 


(Q7Z 1975 1974 1975 1976 


<RU BE Te PHY Re 


PROJECT 


vertical drop of 120 metres will 
bring its installed capacity to 
1,500,000 kilowatts. 

The LG-2 powerhouse is ex- 
pected to be in operation by 
1980, delivering partial power of 
490,000 _ kilowatts, while the 
entire installed power and electri- 
city produced by the La Grande 
complex, 8.3 million kilowatts in 
all, will be available for—use_in 

Quebec by 1985.This will boost 


/ Quebec’s position as the leading 


province in the production of 
electrical energy in Canada. Cur- 
rently, Quebec produces about 
one-third of Canada’s total elec- 
tricity and is rapidly becoming 
one of the world’s leading pro- 
ducers. It now stands second 
\ only to Norway in the amount of 
tricity produced per capita. 
While Canada hasbeen en- 
dowed with large energy re- 
sources, the demand for energy 
has been increasing at the brisk 
pace of 6.7% per annum. In 
Quebec, the rate of increase has 
been slightly higher with demand 
doubling about every nine years. 
It is estimated, in fact, that total 
Capacity required in Quebec may 
illion kilowatts in 1985. 
/ As these projections indicate, 
_ James Bay power production will 
. supply a very significant part of 
~Quebe’s future power needs. 


James Ba 


VANCOUVER-SUN 10/3/77 
OTTAWA (CP) — The James Bay land 
claims agreement, the first major, modern 
treaty with Canadian native people, be- 
came law today. ; 

Bills making the historic agreement final 
were proclaimed simultaneously by the 
federal and Quebec governments. 

The agreement gives roughly 6,500 Cree 
and 4,200 Eskimos living in Quebec’s north- 
ern territory $255 million over 20 years, 
ownership of small parcels of land for their 
communities, plus exclusive hunting, fish- 
ing and trapping rights over large tracks of 
land 


In return, they surrendered their aborigi- 
nal rights to the 379,000-square-mile territo- 


There had been problems about selection 
of Eskimo lands, but Indian Affairs Minis- 
ter Hugh Faulkner said today these were 
resolved last week. : 

The Eskimos also have complained that 


y land pact signed 


DISTANCES 
from 
MONTREAL 
IN KILOMETRES 


K00>-9 7600 Km 
TRA 


rT 


Quebec’s language charter violates the 
agreement and last month asked Ottawa to 
withhold proclamation of its bill. 

Faulkner, however, said in the news re- 
lease that there is no conflict between the 
language charter and the James Bay 
agreement. 

A clause in that bill says the agreement 
takes precedence over any other provincial 
law applicable to the territory. The federal 
bill contains a similar clause. 

The Eskimos sought exemptions from 
sections of the language charter requiring 
children whose parents were not educated 
in English in Quebec to attend French 
schools. 

They also have demanded exemptions 
from sections of the language law that 
would require them to introduce French 
into native-controtled businesses. Both 
exemptions were denied. 


James Bay 

Winnipeg 

St. John’s 

Goose Bay 

Hudson Strait 

Jacksonville, 
Florida 


BOREAL INSTITUTB Gi5:6.5 24 
LIBRARY, 


KM FROM 
MONTREAL 


230 
165 
480 
800 
890 
830 
1800 
1650 
1275 
1600 


1575 


51 


ALL ABOUT 


Energy and transportation were the major attractions to the aluminum 
pioneers of the St. Lawrence Valley at the turn of the century. They started 
what has become a $2.5 billion industry, employing nearly 50,000 
people coast-to-coast, and a key component of the Canadian economy. 

Canada is the western world’s third largest aluminum producer, after 
the U.S.A. and Japan, and, in most years, has been the world’s leading 
exporter of ingot. From its birth in 1901, the. Canadian aluminum industry 
has produced more than 24 million tons of ingot, worth over $10 billion. 


Water tumbling from high plateaus 
and mountains, or sweeping 
down the St. Lawerence, turns 
turbines and generators to pro- 
duce the large quantities of 
power needed for smelting al- 
* uminum. Inland waterways, and 
deep coastal ports, allow ships 
up to 30,000 tons or more to land 
raw materials -- mainly bauxite -- 
from the Caribbean, Latin Amer- 
ica, Africa, and from Newfound- 
land. The same ships leave with 
holds full of ingot for world 
markets. Aluminum for the U.S.A. 
goes mainly by rail. 

Seventy-six years ago, Can- 
ada’s first aluminum smelter was 
completed at Shawinigan, Que- 
bec, on the St. Maurice River, 
upstream from the pulp and paper 
town of Trois-Rivieres. Slowly 
over the years, aluminum produc- 
tion grew until by 1950, Canada 
became known as the “purveyor 
of aluminum”. Since then, other 
countries have entered the mar- 
ket, but Canada’s wealth in re- 
newable hydro energy ensures 
its place as a major aluminum 
producer. 

From its beginning at Shawini- 
gan, the aluminum industry grew 


Extruding 


Extruded Shapes 


Or! 


to include the Arvida facility on 
the Saguenay River. Taking ad- 
vantage of the roaring waters be- 
low Lac St, Jean, the Saguenay 
operation started in 1926 and be- 
came the world’s largest smelting 
complex. It retains that distinc- 
tion now with 560,000 short tons 
annual capacity ‘in ingot. The al- 
uminum industry In Canada con- 
sists of Alcan Aluminum Ltd. as 
the main ingot producer and fab- 
rication, with its/plants spanning 
the nation ae smelters in the 
Saguenay, a hewn , Beau- 
as near Vente ae itimat, 

) The other company \is the 
Cae Reynolds Metals group 
with four Companies. 

Together these companies 
have more than $2.5 billion in- 
vested In harnessing hydro power; 
organizing the flow of materials, 
in smelters, fabricating and al- 
umina plants, in technology and 
manpower. Alcan employs about 
20,000 people, and the Reynolds 
group 3,300. Alcan, Canadian- 
based, is the most international of 
the | worlds’s aluminum com- 
panies. Half its total investment is 
in Canada, and it has bauxite, 
alumina, smelting and fabricating 


FABRICATING PROCESSES 


=a 


interests in the U.S.A., Europe, 
Scandinavia, India, Japan, Latin 
America, Autralasia and Africa. 
The flows of materials are organ- 
ized on a broad _ international 
scale, much like a major world oil 
company. 

The Canadian Reynolds Metals 
group consists of four separate 
companies. Canadian Reynolds 
Metals Co. Ltd., owned 100 per 
cent by Reynolds Metals of the 
U.S.A., operates the 175,000 
tons yearly capacity smelter at 
Baie-Comeau, about 800 kilo- 
metres northeast of Montreal, on 
the St. Lawrence north shore. 
About 60 percent of its ingot is 
moved to other Reynolds plants 
in Canada, and the rest goes to 
Reynold’s American finishing 
operations and other markets. 

Reynolds Aluminum Co. of 
Canada Ltd. is the main fabricat- 
ing company with a large plant at 
Cap-de-la-Madeleine, near Trois 
Rivieres, Quebec, and is minority- 
owned by Canadians. The 
Reynolds group also operates a 
rod, wire and cable plant at La 
Malbaie, 100 kilometres east of 
Quebec City; has other fabricat- 
ing operations in Montreal and 
Toronto; and extrusion plants at 
Ste. Therese, Quebec, and Rich- 
mond Hill, near Toronto. The Rey- 
nolds Canadian sales network 
covers most major cities coast- 
to-coast, and the group sells semi- 
finished products to Canada’s 
large number of independent fab- 


Casting 


7 


Aluminum is easy to fabricate. It can be rolled, 
pressed, drawn, impact extruded, forged, cast formed, 
welded, riveted, brazed, glued, sheared, sawn, etc. Its 
surface can be patterned, and anodized to give it a 
tough, natural or coloured finish. 


MAP OF THE WEEK 


SPL Ways 


EGi)-21-5'm 
L.G2-142m 
L.G.3 - 79.5 m 
L.G.4-120m 


VERTICAL DROPS 


CAMAPISCAU RIVER 
BASIN 
LA GRANDE RIVIERE 
BASING 


SALE IN KILOMETERS 


>< 
Lu 
ad 
a. 
= 
O 
O 
co 
Lu 
= 
O 
oO. 
o 
LL} 
- 
< 
> 
Lu 
Q 
<= 
< 
o 
LO) 
< 
and 
Lud 
as 
= 


. Printed in Canada by 
Service Printing 


LETTERS 


Will there be articles on political 
leaders? We find it difficult in a rural area 
to have materials on elections and leaders 
which can be used in class. 

The forthcoming issues on population 
will be very welcome! Also, Canadian 
foreign policy is difficult to teach due to 
lack of basis materials on Nato, Norad, 
U.N. and Commonwealth. We _ look 
forward to your magazine. 

Pearl Gregor 
New Sarepta 
High School, 
New Sarepta, Alberta 


Thank you for the prompt delivery of 
the back issue of your first edition. 

I was particularly interested in your 
article on the dig at Namu. Here at Simon 
Fraser we have a particular interest in 
educating students about the topic of 
archaeology. Our first interest is, of 
course, to sensitize students to the need 
for the conservation and correct excava- 
tion of archaeological sites. The archaeol- 
ogy department has an active school 
programme for just this reason. 

Your article on Namu was interesting 
but incorrect in places. Parts of the 
diagram of the stratigraphy are com- 
pletely reversed. I fear that your artist did 
not have a clue about the hafting or 
appearance of microblades. 

If you decide to do more articles on 
archaeology please feel encouraged to do 
so. However, I should like to offer either 
my services or those of the appropriate 


faculty member to preview articles on 
archaeology before publication. We will 
happily provide this service at no cost to 
your publication. 
Thank you for your interest. 
Editha Stephens, Ph.D. 
Curator of Education 
Museum of 
Archaeology and 
Ethnology 
Simon Fraser 
University 


We apologize for the errors and accept your 
previewing offer with gratitude. 
The Editors 


CANADA NOW! is published by Canada Now! Publishers Ltd., P.O. Box 91386, West Vancouver, B.C. V7V 3P1 


Phone (604) 926-2864 


Publisher and Editor: Colin H. Campbell 


Comptroller: R.W. Thacker, C.A. 


Writers: Angus Gunn, Faculty of Education, U.B.C.; David Breen, Dept. of History, U.B.C. 


Translator: Jean-Claude Arluison 
Circulation: Laurie Bissett 
Art Director: Richard Sandoval 


Printed in Vancouver by Service Printing. Canada Now! is not responsible for loss or damage of unsolicited manuscripts 
or photographs. Second Class Mail Registration No. 4106. 


INTRODUCTORY SUBSCRIPTION RATES: $18 for 36 issues; class sets of 10 or more - $15 each. 


SUBSCRIPTION ORDERS PLACED AFTER DECEMBER 31, 1977 — $18 for 18 issues 
BACK ISSUES $2 ea. 


CANADA NOW! 


Subscriber: 


P.O. Box 91386, West Vancouver, B.C. V7V 3PI1 


SUBSCRIPTION ORDER FORM 


Dept: 


Street: 


Province: 


City: 


Purchaser: 
Street: 


City: 


P.O. No.: 


Province: 


Quantity: 


Sub(s) 


Commencing: 


INTRODUCTORY SUBSCRIPTION RATES: $18 for 36 issues; class sets of 10 or more - $15 each. 


Postal Code: 


Postal Code: 
@$18ea. $ 


Authorization 


63 


a) eee 


os 


University of Alberta Library